North Wind Measurement

Full Service Wind Site Assessment
Wind Measurement = Shadow Flicker  = Noise


Farm   =  Home = Community  = Commercial

Wind Assessment Reports

The wind assessment report includes all the information you'll need to make an informed decision on a wind turbine installation. This includes:

    ●  Projected average annual windspeed at various elevations
    ●  Projected annual output from various wind turbine systems
    ●  Statistical month-to-month and yearly variation in production
    ●  Plots of turbulence and wind shear to identify obstructions
         that may present performance problems

The links below are for two recent assessment reports.

The first is the "Technical Report" submitted with a REAP (Renewable Energy for America Program) grant.

The second is for a site at a Michigan school.


Sample Report #1

Sample Report #2

Wind Site Assessments Performed by

North Wind Measurement

Michigan

Met Tower Ht

Proposed

Proposed

Location

(meters)

Turbines

Total Capacity (kW)

Leland

20

1

 5 - 20 kW

Benzie County

28

1 to 2

100 kW to 4 mW

Mayville

28

1

20 to 500 kW

Ogemaw County

50

8

10 to 20 mW

Bay County

50

2

600 to 3000 kW

Isabella County

50

1

300 kW

Traverse City

28

1

10 to 90 kW

Acme

50

1 to 2

750 to 1700 kW

Northport

40

3

5 mW

Northport

29

1

300 kW

Northport

29

1

20 to 90 kW

Northport

20

1

2 to 20 kW

Charlevoix County

50

4

2 to 4 mW

Ludington

28

1

10 to 65 kW

Calumet (east)

40

TBD

TBD

Calumet (west)

40

TBD

TBD

Pellston (airport)

10

4

10 kW